TCE has been involved over the past few years with the development of Dollar General sites throughout Vermont. TCE services start at the beginning of the process with a due diligence report to ensure the site is appropriate for a...
Services
Due Diligence/Feasibility, Survey Services, Engineering/Final Design, Permitting, Construction Phase Services
Hotel Jay & Pumphouse Water Park At Jay Peak Resort, TCE provided all of the survey and site / civil design services for Hotel Jay and Pump House Water Park. There were many challenges with this unique project including stormwater design...
Client name
Hotel Jay & PumphouseServices
Construction Surveying, Innovative Stormwater, Site Engineering
Jay Peak Resort retained TCE to provide roadway, stormwater and erosion control design for the new Jay Peak Access Road connecting Route 242 to the Main Tram Base Area of the resort. TCE provided a roadway design incorporating the resorts...
Services
Erosion Control, Roadway Design, Stormwater Design, Surveying, Construction Services
Munroe Brook Flow Restoration Plan Starting in 2004 TCE, collaborating with Dr. Richard Downer, P.E., was selected by the Town of Shelburne to conduct a stormwater survey for two selected contributors in the Munroe Brook Watershed. Extensive field reconnaissance and...
Services
Stormwater Feasibility, Field Assessments, Stormwater Design, Hydrologic Modeling, Municipal Services, GIS Analysis,
Northwest Regional Planning Commission – Town Inventory Update Trudell Consulting Engineers was selected to collect inventory of culverts and bridges throughout Franklin Country Vermont for the Northwest Regional Planning Commission. TCE’s GIS Analyst traveled throughout Franklin, Georgia and Richford on...
Services
Locating Town Bridges, Locating Town Culverts, Municipal Services, GIS Data Collection
TCE has been assisting Pike Industries, Inc. with surveying, site design, permitting, stormwater management, erosion control, construction, and on-going permit compliance at their various Vermont facilities since 1992. These site include asphalt plant, labs, maintenance facilities, and various extraction sites....
Services
Stormwater Permits, Quarries and Pits, Maintenance Facilities, Compliance Services
TCE has proudly provided consulting services to Smuggler’s Notch Resort for over 30 years. As the resort has expanded, TCE has provided designs for expansions to the resort’s water system which has included design, permitting, operations and maintenance manuals for...
Services
Mapping, Water System, Firepond/Reservoir Site Design, Permitting
Stowe Club Highland is a resort PUD that was started in 1982. Trudell provided boundary and topographic survey of the 236 acres. Our services included site design for the hotel and 68 residential units (single family and multi–family). The design...
Services
Master Planning, Land Surveying, Stormwater/Water Supply, Wastewater/Environmental, Landscape, Site Design
Williston suffered a failed culvert in the spring of 2016 which required a road closure. TCE responded quickly with survey, design, bid and construction phase services to replace the culvert with a new 142” x 91” polymetric coated arch pipe....
Client name
Town of WIllistonServices
Topographic Survey, Engineering, Erosion Control, Construction Phase Services, Bid Phase Services
TCE working in combination with EIV Technical Services provides survey services 1-3 days per week for the duration of a major bridge project on I-89 over the Lamoille River. Services include but are not limited to establishing controls, locating various...